Item #3098 "Amalgam"
Description:
                A control board at Upsilon Manufacturing has been covered by structure gel and rendered inoperable. The
                structure gel has dropped from a leak in the ceiling and managed to cover the control board as well as a good part of the floor.
                
 cleaning up the structure gel
                FST Azzaro noticed that some gel had coagulated and fused with the control board. The system itself
                seems unharmed and the f
ctory line is still operating 
            
                A closer look has determined that the coagulated gel can not be removed 
                serious damage to the control board and possibly the system. Chief factor Adams has decided t
at as long
                as it is working pro
erly there is no reason to attempt any “surgery”.
            
Appendix: Broken Control Board
                
            



